Skip to content
Acasă » Oil&Gas » INSPET announces the entry into use of the natural gas drying station from Bilciurești

INSPET announces the entry into use of the natural gas drying station from Bilciurești

    15 December 2021
    Oil&Gas
    Gabriel Avăcăriței

    The Bilciurești natural gas drying station is part of the surface installations of the largest natural gas storage depot in Romania, which currently provides 44% of Romania’s storage volume. Following an investment of 7.6 million euros, the capacity of the installation has been increased 3 times, states INSPET, in a post on Facebook.

    “By completing this project, we have contributed to increasing the daily extraction capacity by over 5 million standard cubic meters, thus ensuring a necessary increase in natural gas in the winter months,” said Ciprian Păltineanu, CEO and Chairman of the Board Inspect.

    The official opening and reception were presided over by the Prime Minister Nicolae Ciucă, Virgil Popescu, the Minister of Energy, Dumitru Chiriță, ANRE President, Vasile Cârstea, the General Manager of Depogaz, Aristotel Jude, the General Manager of Romgaz.

    Autor: Gabriel Avăcăriței

    Gabriel Avăcăriței is a journalist and communicator with over a decade of experience in Romania’s energy sector. Since 2013, he has been Editor-in-Chief of Energynomics, the country’s leading B2B communication platform for the energy industry. He moderates all Energynomics conferences and debates, bringing clarity and depth to discussions among policymakers, business leaders, and innovators. Under his leadership, Energynomics has evolved into the most comprehensive editorial project in Romania’s energy field, combining a news website, quarterly magazine, and a wide portfolio of industry events that inform and connect the energy community.

    Leave a Reply

    Your email address will not be published. Required fields are marked *